- 2014-01 Hall D: Target Controls
Robert Teachey - 2014-02 Hall B: HPS Interlock
Brian Eng - 2015-01 Hall B: Proposal for Drift Chamber Gas System
David Butler - 2015-02 Hall B: Proposal for Detectors' Gas Systems
David Butler - 2016-01 HDice: Progress Review of Controls & Monitoring System
Peter Bonneau - 2016-02 Hall B: Controls & Monitoring for Gas System
Marc McMullen - 2016-03 DSG Report
Amrit Yegneswaran - 2016-04 Hall D: Voltage Taps Database in SQLite
Amanda Hoebel - 2016-05 Hall B: RICH Detector Status Update
Tyler Lemon - 2016-06 Hall D: Solenoid PLC Controls
Pablo Campero - 2016-07 Hall B: MVT Gas Mixing System
George Jacobs - 2016-08 HDice: Review of Controls & Monitoring System
Peter Bonneau - 2016-09 Hall B: RICH Detector Status Report
Tyler Lemon - 2016-10 Hall B: Forward Tagger Status Report
Amanda Hoebel - 2016-11 Hall B: Hardware Review of Detectors' Gas System
George Jacobs - 2016-12 Hall B: Software Review of Detectors' Gas System
Marc McMullen - 2016-13 Hall B: SVT Noise Test
Brian Eng - 2016-14 Hall B: Magnet Status Report
Pablo Campero - 2016-15 Hall B: RICH Detector Status Update
Tyler Lemon - 2017-01 Hall B: RICH Detector Assembly Status
DSG - 2017-02 HDice: Controls & Monitoring Status Report
Amanda Hoebel - 2017-03 Hall B: Solenoid Status Report
Pablo Campero - 2017-04 Hall D: Forward Drift Chamber (FDC) Overview
Amanda Hoebel - 2017-05 Hall D: Central Drift Chamber (CDC) Overview
Tyler Lemon - 2017-06 Hall B: RICH Detector Exit Window Assembly
Tyler Lemon - 2017-07 Hall B: LTCC Leak Analysis
Amanda Hoebel - 2017-08 Hall B: RICH Detector Reflectivity Test Station Calculations
Amanda Hoebel - 2017-09 Hall B: RICH Detector Reflectivity Test Station Error Propagation
Tyler Lemon - 2017-10 Hall B: LTCC Leak Study
Marc McMullen - 2017-11 Hall B: RICH Detector Spherical Mirror Reflectivity Test
Tyler Lemon - 2017-12 Hall B: Detectors' Gas Systems Status
George Jacobs - 2017-13 Hall B: CLAS12 Solenoid Pre-power-up Interlock Checkout
Brian Eng - 2017-14 DSG R&D: Test Stand for CompactRIO Analog Input Modules
Mary Ann Antonioli - 2018-01 Hall B: MVT Gas Mixing System Status
Marc McMullen - 2018-02 Hall B: Magnet Issues from 1/12/17 to 1/15/18
Pablo Campero - 2018-03 Hall B: RICH Detector Issues from 1/12/17 to 1/15/18
Tyler Lemon - 2018-04 Hall B: RTPC Status Update
Marc McMullen - 2018-05 Hall B: Magnet Issues from 1/16/18 to 1/24/18
Tyler Lemon - 2018-06 Hall B: Magnet Issues from 1/24/18 to 1/31/18
Brian Eng - 2018-07 Hall B: SVT Performance During Engineering Run
Peter Bonneau - 2018-08 Hall B: SVT Task Request and Status
Brian Eng - 2018-09 Hall B: LTCC C4F10 Distillation and Recovery Process
George Jacobs - 2018-10 Hall B: SVT Leak Sensor Debugging
Pablo Campero - 2018-11 HDice: NMR Synchronization Status
Peter Bonneau - 2018-12 Hall B: SVT Hardware Interlock System Update
Peter Bonneau - 2018-13 Hall B: LTCC Single Sector Test Status Update
George Jacobs - 2018-14 Hall B: RICH Detector Health Report
Tyler Lemon - 2018-15 Hall B: Torus Magnet and Solenoid Health Report
Pablo Campero - 2018-16 Hall B: SVT Health Report
Amanda Hoebel, Brian Eng - 2018-17 Hall B: Detector Gas Controls Health Report
Marc McMullen - 2018-18 Hall B: LTCC Gas System Status
George Jacobs - 2018-19 Hall B: RICH Detector Interlock Trip on August 7, 2018
Tyler Lemon - 2018-20 Hall B: RTPC Gas System
George Jacobs - 2018-21 Hall A: SOLID HGC Gas System
George Jacobs - 2018-22 DSG: Select Projects 2018
Amrit Yegneswaran - 2018-23 Hall C: EPICS Controls & Monitoring System
Peter Bonneau - 2019-01 HALL B: LTCC Supply and Recovery System
Marc McMullen - 2019-02 HALL B: Solenoid Magnet Fast Dump Investigation
Pablo Campero - 2019-03 HALL B: d0 Test Improvements for the RICH Detector
Tyler Lemon - 2019-04 HALL C: EPICS CSV-to-CSS for HMS Detector Controls & Monitoring Screens
Amanda Hoebel - 2019-05 DSG R&D: Testing of cRIO Analog Output Module NI-9265
Mary Ann Antonioli - 2019-06 HALL A: PLC Upgrade of the Dynapower Magnet Protection System
Brian Eng - 2019-07 HALL C: CAEN SY4527 Crate and A7435SN Module Test Stand
Marc McMullen - 2019-08 DSG R&D: SHMS-HMS - Data Transfer between PLC and EPICS
Pablo Campero - 2019-09 HALL B: Improvements of the Temperature and Humidity Measurement System Using Sensirion SHT85 Sensor
Peter Bonneau - 2019-10 HALL C: Work Status Report on Controls & Monitoring Systems
Peter Bonneau - 2019-11 HDICE: Status of HDice Controls & Monitoring Instrumentation and Software Development
Amanda Hoebel - 2019-12 HALLS A, B, C, & D: Controls & Monitoring Systems for Magnets
Pablo Campero - 2019-13 HALL C: HV Backup/Restore Program Improvements for EPICS Controls & Monitoring System
Tyler Lemon - 2019-14 HALL A: Gas Distribution for BigBite and Super BigBite Spectrometers
Marc McMullen - 2019-15 HALL C: NPS CAEN HV Test Results
Pablo Campero - 2019-16 HALL D: Conversion of CSS-BOY Screens to WEDM
Tyler Lemon - 2019-17 HALL B: DSG-Designed Gas Controls & Monitoring Systems
Marc McMullen - 2019-18 HALL A: Honeywell Zephyr HAF Series High Accuracy Mass Flow Meters for GEM Detector Gas Distribution System
George Jacobs - 2019-19 DSG R&D: NI 9871 Module Testing Progress Report
Aaron Brown - 2019-20 HALL C: Issues with CAEN SY4527 Software/Firmware and A7030TN Modules for NPS
Marc McMullen - 2019-21 DSG R&D: LV Chassis Improvements for Solenoid's and Torus Magnet's Sensor Readout
Tyler Lemon - 2019-22 HALL A: GEM Detector Gas Distribution System Rack
George Jacobs - 2019-23 HALL B: FastDAQ for PLC/EPICS Communication of the Magnets
Brian Eng - 2019-24 DSG R&D: NI 9871 Module Testing Progress Report
Aaron Brown - 2019-25 HALL C: CAEN SY4527 HV Test Chassis Development for NPS
Marc McMullen - 2019-26 DSG: Select Instrumentation and Controls & Monitoring Software Development Projects (pdf)
Amrit Yegneswaran - 2019-27 Hall B: Cooling System Optimization for the RICH Detector
Tyler Lemon - 2019-28 Hall B: BoNuS Gas Controls System
Brian Eng - 2019-29 DSG R&D: Proposed EPICS Data Logger
Aaron Brown - 2019-30 Hall C: NPS CAEN HV Test Results
Pablo Campero - 2019-31 Hall C: CAEN SY4527 HV Tests for NPS
Pablo Campero - 2019-32 Hall B: sbRIO-based Upgrade of Magnets' MSELV Chassis
Tyler Lemon - 2019-33 Hall C: NPS CAEN SY4527 HV Board Tests
Marc McMullen - 2019-34 Hall B: Additional Features for MSELV Chassis with sbRIO for Solenoid and Torus Magnet Sensors
Tyler Lemon - 2019-35 Hall A: Design and Routing of the Constant Current Source Board for SoLID
Marc McMullen - 2020-01 Hall C: CAEN HV Systems Testing Gameplan for NPS
Aaron Brown - 2020-02 Hall B: Prototype Mirror Testing for RICH Detector
Tyler Lemon - 2020-03 Hall B: Mirror Reflectivity Test Station Upgrade Proposal for RICH Detector
Tyler Lemon - 2020-04 Hall A: SoLID Magnet's Constant Current Source Printed Circuit Board
Marc McMullen - 2020-05 Hall A: SoLID Magnet's Instrumentation and Controls & Monitoring System Status
Pablo Campero - 2020-06 Hall A/C: Jefferson Lab Physics Division EPICS Controls & Monitoring System
Tyler Lemon - 2020-07 Hall C: HMI and EPICS for HMS and SHMS Systems
Pablo Campero - 2020-08 DSG: Jefferson Lab's Computer Network System
Peter Bonneau - 2020-09 HDice: DSG Contributions to Instrumentation and Controls & Monitoring Systems
Tyler Lemon - 2020-10 DSG: Work Safety at Jefferson Lab During Elevated MedCon Conditions
Marc McMullen - 2020-11 HDice: Additional fsNMR Program Features
Tyler Lemon - 2020-12 Hall A: PLC Control Systems for SoLID
Pablo Campero - 2020-13 Hall C: Status of NPS CAEN System Testing Analysis
George Jacobs - 2020-14 Hall C: Controls & Monitoring Screens Development for NPS
Aaron Brown - 2020-15 Hall A: Controls & Monitoring System for SoLID
Pablo Campero - 2020-16 Hall B: Re-establishing R3 Drift Chamber Gas Supply
Brian Eng, Marc McMullen - 2020-17 Hall A & Hall C: Test OPI Creator for EPICS CSS-BOY Screens
Tyler Lemon - 2020-18 Hall A: SoLID Magnet's Motor Controller Relay Board
Marc McMullen - 2020-19 Hall A: BigBite and Super BigBite Gas Distribution System Flow Readout Electronics
Brian Eng, Marc McMullen - 2020-20 Hall A & Hall C: Generating CSS-BOY Screens for Magnet and Detector Instrumentation Controls & Monitoring
Mary Ann Antonioli - 2020-21 Hall A: SoLID Solenoid - Design and Development Highlights
Mary Ann Antonioli, Pablo Campero, Tyler Lemon, Marc McMullen - 2020-22 Hall C: DSG - NPS Contributions Status Report